Participation in THIQAR Project
Between April to June 2017 the following works were successfully completed By Pro DGS for the TRAILING SUCTION HOPPER DREDGER VESSEL THIQAR:
- Excavator arms, lowering mechanisms and crane systems of hopper dredger system were maintained.
- Maintenance, repair and circuit tests of all hydraulic circuits of the system were performed.
- Plc software of system has been updated.
- Maintenance, repair and tests of 12pcs DN600 gate valves of the system were carried out.
- Repairs and tests of the hatch covers in the lower part of the ship were carried out.
- Shaft, propeller, machinery and rudder systems of the ship were overhauled.
- Watertightness tests and operations of watertight sliding doors were carried out.
- All blasting, painting, and cathodic protection works of the ship were carried out.
April – June, 2017